DMS 130

Back

July and August 2006

Click herefor June 2006, here for September 2006

Click on any photo for a full-size version

Pillar being "stretched"  

1st. I cut the third pillar and "stretch" it.

1st. Same cut, after Bob has welded in a new piece.

after the weld
Lip being added

6th August. Due to holidays, a family wedding, a heatwave, and a busy time at work, I have shamefully neglected the bus recently. But I hope to resume progress from today. Today's job is to add a lip to the steel mid-panel and to prepare to add the strengthener which will give it greater rigidity.

August 6th. The 3rd window is fitted (for now) and the 4th pillar fixed.

  Windows aligned
Strengthener fitted  

August 8th. I fit a hefty strengthener to the stress panel midships.

August 12th. I use the old steel as a template

  {short description of image}
{short description of image}  

August 12th. The original wheel-arch is refitted

August 12th. A second strenghener is fixed temporarily in place

  {short description of image}
{short description of image}  

August 13th. Another good day! I added an 8' piece of steel angle to the rear nearside corner.

August 13th. Having fitted the steel angle inside, I was able to start tidying up the angle between the boot front and the rear panel.

 
{short description of image}  

August 13th. An interior shot of the rear wheel-arch.

August 13th. The nearside takes shape!

  long range view
Nearside rear  

August 16th. Nearside rear tidying up started.

August 16th. Exhaust pieces ready to be fitted.

  Exhaust pieces
Rounding the arch  

August 16th. Wheelarch being cut out.

August 16th. I cut the final pillar to fit against the least bearer.

  Final pillar cut to fit
Another panel in place  

August 16th. Getting ready for the 4th window.

August 17th. Amazingly, the 4th window fits first time!

   Window under test
 4 windows aligned!    

August 17th. In poor light, in between rain-showers I take a shot of all 4 windows aligned.

Aughst 19th. Having checked the fit from all angles, I finally fasten the 4th pillar to the stress panels.

   rear nearside panel joined
 Wheelarch shaped  

Aughst 19th. Now that the 4th pillar is fixed I can tidy up the wheel-arch.

August 19th. A view along the whole nearside!

   More rivets than a battleship
 Corner finished off  

August 22nd. The corner is "neatened up"

 

August 22nd. A shot in the dark!

   An inside view
 exhaust refitted    

August 26th. Exhaust refitted.

 

August 28th. The heater is refixed so that the engine could be started. I THEN WENT FOR A SHORT RUN!

   Heater fixed
 Propshaft painted  

August 29th. Moving the bus meant I could get to the underside of the propshaft!

August 29th. To celebrate the starting of the engine, I bought a pair of batteries.

   New batteries
 Control box  

August 30th. Sorting out the cutout switch.

Top of page    

This document maintained by JohnB@crownsys.co.uk.
Material Copyright © 2006 John Braga