1st. The strengtheners are fixed
permanently.
|
3rd. Bob removes the remaining 3 old uprights
|
|
 |
 |
|
3rd. Rather a lot of empty space(!)
|
3rd. New uprights in place
|
|
 |
 |
|
7th. Uprights silvered
|
10th. The 2nd plank has been carefully aligned to the first.
|
|
 |
|
|
16th. The new steel has been collected and is in primer.
|
20th. A very productive day! The new steel horizontal is in place
and drilled.
|
|
 |
 |
|
20th. The first 2 bays are taking shape!
|
26th. I bought an offcut of Rexine to try the colour.
|
|
 |
 |
|
26th. I tried refitting a window (temporarily) to test that it
fitted, and that all was square.
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|