1st. Bob the Blacksmith welds the second pillar into position!
|
|
 |
 |
|
4th. I cut the end of the first bearer to length.
|
5th. The bearer is clamped down with a pair of 7/16" bolts
on a webbing base.
|
|
 |
|
|
5th. Primer on the newly-arrived pillar sections.
|
5th. I remove the bolts holding the 3rd nearside pillar in place.
|
|
 |
 |
|
14th. 3 windows cleaned up.
|
| 14th. I drill and fix the front bearer to the offside.
|
|
|
 |
|
14th. New pillars are painted.
|
16th. First new horizontal stretcher in place.
|
|
 |
 |
|
16th. Last 2 windows removed from nearside.
|
22nd. I detatch the last bit of steel from the nearside.
|
|
 |
 |
|
22nd. Not much left of the nearside.
|
| 29th. I have collected 6 shaped steel pieces
from Bob to make strengtheners to attach the side planks to. They will screw to
the new pillars.
|
|
 |
 |
|
30th. The strengtheners are bolted into place.
|
30th. The first plank is fitted!
|
|
 |