DMS 130

Back

January and February 2006

Click here for November 2005, or here for March 2006

Click on any photo for a full-size version

Nearside Panel in place  

21st. After the Christmas/New Year break, when I was away on family duty, and a long spell of very cold weather when I did not feel very keen on climbing under a bus, work recommenced.

I positioned the rear side panel roughly in place.

21st. The panel forming the rear of the boot needs to be trimmed

Trimming needed
Panel fixed

Feb 4th. With the help of a bus-mate, the side panel is finally fixed in place with a few bolts.

17th. Surprise, surprise! I visit Bob the blacksmith to complain about his non-appearance, and he produces new steel bearers and 2 soldered pillars!

  Being painted
ground off  

18th. I grind off the bolt from the large hasps holding the front bearer in place (the blacksmith having delivered the replacement steel). The Bolt head is removed, but the shank stays obstinately in place. I may have to drill it out.

18th. While I have the paint out I put another coat on the back of the front bulk-head.

  Bulkhead
Top of page    

This document maintained by JohnB@crownsys.co.uk.
Material Copyright © 2006 John Braga